
Metro stations
Metro closes late and opens early, and the floor carries brake dust that ordinary mopping moves around rather than removes. The window is the hardest constraint on this list.
Coverage arithmetic
An 8,000 m² station, cleaned in a three-hour window
8,000 m² at up to 1,980 m²/h is about four machine-hours against a window that is frequently three. That is the case for two units rather than one, or for splitting the station across two nights on a rotation. Both are specified at survey, and both cost less than the third option, which is not finishing.
8,000
m² · Typical floor
1
Machines needed
4
machine-hours · One full pass
4
machine-hours / 1
The building
Metro stations
The fleet
Large format
The commitment
Metro stations
Also on site



What changes
Handback on time
because the machine stops and returns to dock on a clock, not when somebody notices the hour.
Brake dust lifted
by a scrub-and-extract pass rather than redistributed across the tile by a mop.
Two nights or two machines
is a decision made at survey with the arithmetic in front of you, not discovered in month three.
These are worked models, not named customer references. Areas and operating patterns come from sites we have surveyed; throughput, width and runtime figures are the published performance of the platforms we deploy. Your numbers are established during the free assessment.
Let us look at your floor.
A survey, a cost model and a specific recommendation. Free, and yours to keep.