Compact fleet · three units
6,800 m² of hospital corridor, twice a day
Corridors that cannot wait for a night shift that did not turn up, and an infection-control team that needs evidence rather than assurances. Consistency here is a clinical requirement, not a finish standard.
01 The building
Healthcare
The fleet
02 The machine
Compact fleet · three units
Coverage arithmetic
6,800 m² of corridor divides cleanly into three zones of about 2,300 m² — each inside a single machine-charge, so no unit has to interrupt a route to dock. Running overnight plus a low-traffic afternoon window gives two full passes a day, and every pass leaves a timestamped record the audit can cite directly.
03 Also on site
Nine footprints and the dock that runs them



04 What changes
What changes
Two passes daily
instead of one overnight pass that depended on a crew turning up.
Audit trail automatic
coverage and timestamp per pass, exportable straight into the infection-control record.
Consistent across wings
because the route is configuration, not a judgement made differently on each floor.
Which of these is your building?
Or something we have not modelled yet. Either way, the assessment is free and the numbers are yours to keep.